Development activity
Aggregated commits and line additions from GitHub, GitLab, and Bitbucket (weekly buckets in Notion). Set NOTION_DB_COMMIT_ACTIVITY and run the weekly sync workflow to populate data.
Design and details of a 13 m clarifier bridge, scraper arms, drive system and stilling well, plus three maintenance gantries to BS standards.
Rectangular and round wastewater tanks, HDPE/PE 100 pipe supports and modular clamping systems, pipe gantries, rigging studies, and modular plant structures for water treatment clients.
Redesign of waste compaction containers for Husmann systems after widespread failures on earlier builds. Local materials, local transport fit, completed within three months.
Factory planning for 50 ton trailer conversion/repair; design of 35 ton low-bed; unique flooring system for cattle, hog and sheep trailers with about 10% mass saving.
Design and build support for two portal cranes at City of Cape Town refuse transfer and landfill sites — GA approval, manufacturing QC, site assembly inspection, and mechanical consulting.